Examples
Examples
Try the starting example
- Measured outlet flow (L/hour)
- 600
- Actual water volume (L)
- 180
- Nominal turnover rate (per hour)
- 3.333333
- Nominal turnover time (minutes)
- 18
Try another scenario
- Measured outlet flow (L/hour)
- 660
- Actual water volume (L)
- 180
- Nominal turnover rate (per hour)
- 3.666667
- Nominal turnover time (minutes)
- 16.363636
Calculation method
Calculation method
Nominal turnover rate (per hour)
Rate=measured flow/volume; time=60 volume/flow.
Nominal turnover time (minutes)
Rate=measured flow/volume; time=60 volume/flow.
Symbols and units
- a
- Measured outlet flow (L/hour)
- b
- Actual water volume (L)
Use the units shown. A list keeps the order in which you enter its values. The symbol ^ means “raised to the power of”.
Assumptions & limits
Assumptions & limits
- Hydraulic arithmetic does not imply mixing, filtration or livestock suitability. Supported limits: All required fields must be finite values of the exact declared type and within displayed bounds. Lists contain1–1000 finite numbers. JSON tables are numeric rectangular rows, at most100 rows and30 columns; individual tools have stricter shape/domain constraints. Hydraulic arithmetic does not imply mixing, filtration or livestock suitability.
Are these inputs private?
These calculations run in your browser. A shared link contains the values you choose to share. Only questions submitted to the separate AI finder are sent to OpenAI.