Examples
Examples
Try the starting example
- Scaffold bays along length (count)
- 8
- Vertical lifts (count)
- 3
- Frames per bay/lift (count)
- 2
- Ledger pieces per bay/lift (count)
- 2
- Frame quantity (count)
- 48
- Ledger quantity (count)
- 48
- Bay-lift positions (count)
- 24
Try another scenario
- Scaffold bays along length (count)
- 9
- Vertical lifts (count)
- 3
- Frames per bay/lift (count)
- 2
- Ledger pieces per bay/lift (count)
- 2
- Frame quantity (count)
- 54
- Ledger quantity (count)
- 54
- Bay-lift positions (count)
- 27
Calculation method
Calculation method
Frame quantity (count)
Multiply supplied per-bay component counts by bays × lifts; no structural layout or load design.
Ledger quantity (count)
Multiply supplied per-bay component counts by bays × lifts; no structural layout or load design.
Bay-lift positions (count)
Multiply supplied per-bay component counts by bays × lifts; no structural layout or load design.
Symbols and units
- a
- Scaffold bays along length (count)
- b
- Vertical lifts (count)
- c
- Frames per bay/lift (count)
- d
- Ledger pieces per bay/lift (count)
Use the units shown. A list keeps the order in which you enter its values. The symbol ^ means “raised to the power of”.
Assumptions & limits
Assumptions & limits
- User-supplied measurements and assumptions; Multiply supplied per-bay component counts by bays × lifts; no structural layout or load design. Supported limits: Finite numeric values bounded to 1e9 magnitude; lists and tables contain 1–100 records unless a stricter bound is stated. Inputs use the units shown. Lists explicitly paired by a method must have matching lengths; independent polynomial coefficient vectors may differ. Respect stated physical, interpolation, policy and computational domain limits.
Are these inputs private?
These calculations run in your browser. A shared link contains the values you choose to share. Only questions submitted to the separate AI finder are sent to OpenAI.