Construction site welfare occupancy worksheet calculator

Calculate facility units by shift and peak facility units with your own figures.

Your numbers

Use the units shown. Results update as you change valid inputs.

Use facility units by shift and peak facility units to compare changes to your inputs. The method and limits below explain the scope.

Examples

Examples

Try the starting example

Shift simultaneous workforce counts
40,65,30
Supplied maximum people per facility unit
20
Facility units by shift
[2,4,2]
Peak facility units
4

Try another scenario

Shift simultaneous workforce counts
40,65,30
Supplied maximum people per facility unit
15
Facility units by shift
[3,5,2]
Peak facility units
5
Calculation method

Calculation method

Facility units by shift

J([ceil(v/b) for v in a])

Peak facility units

max(ceil(v/b) for v in a)

Symbols and units
a
Shift simultaneous workforce counts
b
Supplied maximum people per facility unit

Use the units shown. A list keeps the order in which you enter its values. The symbol ^ means “raised to the power of”.

Assumptions & limits

Assumptions & limits

  • Only arithmetic under the entered facility ratio; ratio is supplied by project requirements and no regulated welfare adequacy is certified. Supported limits: All numeric inputs must be finite. Only the explicitly described mathematical scenario is supported.
Are these inputs private?

These calculations run in your browser. A shared link contains the values you choose to share. Only questions submitted to the separate AI finder are sent to OpenAI.

Share this page
Share this calculator

Leave unchecked to share the page without your entered values.