Examples
Examples
Try the starting example
- Target finished height including top bed joint (mm)
- 2400
- Supplied minimum bed joint (mm)
- 8
- Supplied maximum bed joint (mm)
- 12
- Unit height (mm)
- 65
- Selected course count
- 32
- Adjusted bed joint (mm)
- 10
- All feasible [courses,joint mm]
- [[32,10]]
Try another scenario
- Target finished height including top bed joint (mm)
- 2470
- Supplied minimum bed joint (mm)
- 8
- Supplied maximum bed joint (mm)
- 12
- Unit height (mm)
- 65
- Selected course count
- 33
- Adjusted bed joint (mm)
- 9.848485
- All feasible [courses,joint mm]
- [[33,9.84848484848]]
Calculation method
Calculation method
Selected course count
First integer courses 1..1000 for which target/courses−unit height is within joint range; zero if none.
Adjusted bed joint (mm)
Target/courses − unit height; zero when no valid course count.
All feasible [courses,joint mm]
Enumerated supported course/joint solutions.
Symbols and units
- a
- Target finished height including top bed joint (mm)
- b
- Supplied minimum bed joint (mm)
- c
- Supplied maximum bed joint (mm)
- d
- Unit height (mm)
Use the units shown. A list keeps the order in which you enter its values. The symbol ^ means “raised to the power of”.
Assumptions & limits
Assumptions & limits
- Exactly one bed joint per course including top bed joint. This convention must match measured target; no structural joint approval. Supported limits: Positive target/unit and 0≤minimum≤maximum. Up to 1000 courses.
Are these inputs private?
These calculations run in your browser. A shared link contains the values you choose to share. Only questions submitted to the separate AI finder are sent to OpenAI.