Examples
Examples
Try the starting example
- Lane length (m)
- 25
- Unfloated end clearance each end (m)
- 0.5
- Float pitch (m)
- 0.1
- Lane rope count
- 5
- Floats per rope
- 240
- Total floats
- 1200
- Unfloated residual in active span (m)
- 0
Try another scenario
- Lane length (m)
- 27.500000000000004
- Unfloated end clearance each end (m)
- 0.5
- Float pitch (m)
- 0.1
- Lane rope count
- 5
- Floats per rope
- 265
- Total floats
- 1325
- Unfloated residual in active span (m)
- 0
Calculation method
Calculation method
Floats per rope
Active length=L-2clearance; count=floor(active/pitch), equal full-pitch float modules.
Total floats
Active length=L-2clearance; count=floor(active/pitch), equal full-pitch float modules.
Unfloated residual in active span (m)
Active length=L-2clearance; count=floor(active/pitch), equal full-pitch float modules.
Symbols and units
- a
- Lane length (m)
- b
- Unfloated end clearance each end (m)
- c
- Float pitch (m)
- d
- Lane rope count
Use the units shown. A list keeps the order in which you enter its values. The symbol ^ means “raised to the power of”.
Assumptions & limits
Assumptions & limits
- Pitch includes float/spacer allocation; specific manufacturer module dimensions must be entered. Supported limits: All required fields must be finite values of the exact declared type and within displayed bounds. Lists contain1–1000 finite numbers. JSON tables are numeric rectangular rows, at most100 rows and30 columns; individual tools have stricter shape/domain constraints. Pitch includes float/spacer allocation; specific manufacturer module dimensions must be entered.
Are these inputs private?
These calculations run in your browser. A shared link contains the values you choose to share. Only questions submitted to the separate AI finder are sent to OpenAI.