Examples
Examples
Try the starting example
- Perpendicular distance to line (m)
- 100
- Measured perpendicular closing speed (m/s)
- 3
- Countdown to start (seconds)
- 40
- Estimated time to line (seconds)
- 33.333333
- Arrival relative to start signal (seconds)
- -6.666667
Try another scenario
- Perpendicular distance to line (m)
- 110.00000000000001
- Measured perpendicular closing speed (m/s)
- 3
- Countdown to start (seconds)
- 40
- Estimated time to line (seconds)
- 36.666667
- Arrival relative to start signal (seconds)
- -3.333333
Calculation method
Calculation method
Estimated time to line (seconds)
Time=perpendicular distance/closing speed; positive relative arrival means after start.
Arrival relative to start signal (seconds)
Time=perpendicular distance/closing speed; positive relative arrival means after start.
Symbols and units
- a
- Perpendicular distance to line (m)
- b
- Measured perpendicular closing speed (m/s)
- c
- Countdown to start (seconds)
Use the units shown. A list keeps the order in which you enter its values. The symbol ^ means “raised to the power of”.
Assumptions & limits
Assumptions & limits
- Constant closing speed, no maneuver, current or race-rule judgment. Supported limits: All required fields must be finite values of the exact declared type and within displayed bounds. Lists contain1–1000 finite numbers. JSON tables are numeric rectangular rows, at most100 rows and30 columns; individual tools have stricter shape/domain constraints. Constant closing speed, no maneuver, current or race-rule judgment.
Are these inputs private?
These calculations run in your browser. A shared link contains the values you choose to share. Only questions submitted to the separate AI finder are sent to OpenAI.