Takt time planner calculator

Calculate net available production time and target takt time with your own figures.

Your numbers

Use the units shown. Results update as you change valid inputs.

Use net available production time and target takt time to compare changes to your inputs. The method and limits below explain the scope.

Examples

Examples

Try the starting example

Shift duration (min)
480
Planned excluded breaks (min)
60
Demand for good units (units)
140
Net available production time (min)
420
Target takt time (min/good unit)
3
Required good throughput (units/hour)
20

Try another scenario

Shift duration (min)
480
Planned excluded breaks (min)
60
Demand for good units (units)
210
Net available production time (min)
420
Target takt time (min/good unit)
2
Required good throughput (units/hour)
30
Calculation method

Calculation method

Net available production time (min)

shift-breaks.

Target takt time (min/good unit)

(shift-breaks)/demand.

Required good throughput (units/hour)

demand/(netMinutes/60).

Symbols and units
a
Shift duration (min)
b
Planned excluded breaks (min)
c
Demand for good units (units)

Use the units shown. A list keeps the order in which you enter its values. The symbol ^ means “raised to the power of”.

Assumptions & limits

Assumptions & limits

  • Demand pacing only, excluding explicitly supplied breaks. No allowance for scrap, stoppages or worker staffing is assumed. Supported limits: shift>breaks>=0; demand integer>0.
Are these inputs private?

These calculations run in your browser. A shared link contains the values you choose to share. Only questions submitted to the separate AI finder are sent to OpenAI.

Further reading

Method reference ↗