Trades weather-delay schedule scenario calculator

Calculate revised task calendar and calendar delay versus same task plan with no exclusions with your own figures.

Your numbers

Use the units shown. Results update as you change valid inputs.

Choose the currency for these amounts. Changing it keeps your numbers and does not convert exchange rates.

Use revised task calendar and calendar delay versus same task plan with no exclusions to compare changes to your inputs. The method and limits below explain the scope.

Examples

Examples

Try the starting example

Tasks [required working days,zero-based predecessors]; enter JSON
[[2,[]],[2,[0]]]
Project start ISO date
2026-11-01
No-work ISO dates; enter JSON
["2026-11-02"]
Interchangeable crews (count)
1
User delay cost (USD/calendar day)
100
Revised task calendar (JSON)
[[1,1,["2026-11-01","2026-11-03"],"2026-11-04"],[2,1,["2026-11-04","2026-11-05"],"2026-11-06"]]
Calendar delay versus same task plan with no exclusions (days)
1
Scenario delay cost (USD)
$100.00

Try another scenario

Tasks [required working days,zero-based predecessors]; enter JSON
[[3,[]],[2,[0]]]
Project start ISO date
2026-11-01
No-work ISO dates; enter JSON
["2026-11-02","2026-11-04"]
Interchangeable crews (count)
1
User delay cost (USD/calendar day)
120
Revised task calendar (JSON)
[[1,1,["2026-11-01","2026-11-03","2026-11-05"],"2026-11-06"],[2,1,["2026-11-06","2026-11-07"],"2026-11-08"]]
Calendar delay versus same task plan with no exclusions (days)
2
Scenario delay cost (USD)
$240.00
Calculation method

Calculation method

Revised task calendar (JSON)

Topological input-order tasks take earliest-free crew; start after predecessors; consume required days excluding listed no-work dates; end date is next calendar day.

Calendar delay versus same task plan with no exclusions (days)

Difference between final revised and no-exclusion finish dates.

Scenario delay cost (USD)

Calendar delay×entered daily delay cost.

Symbols and units
a
Tasks [required working days,zero-based predecessors]; enter JSON
b
Project start ISO date
c
No-work ISO dates; enter JSON
d
Interchangeable crews (count)
e
User delay cost (USD/calendar day)

Use the units shown. A list keeps the order in which you enter its values. The symbol ^ means “raised to the power of”.

Assumptions & limits

Assumptions & limits

  • Work-day task calendar skips exactly user-entered no-work dates; weekends remain working unless listed. Tasks can pause across excluded dates. Supported limits: All numeric inputs and computed intermediates must remain finite. Supported numeric input magnitude is zero or 1e-12 through 1e12 in absolute value; reject values outside this bounded range. All lists/JSON record tables are limited to 100 records unless a stricter bound is stated; reject malformed record arity and wrong member types. Acyclic <=100 tasks, each integer workdays1..30; <=366 excluded dates; crews1..20; all dates valid.
Are these inputs private?

These calculations run in your browser. A shared link contains the values you choose to share. Only questions submitted to the separate AI finder are sent to OpenAI.

Share this page
Share this calculator

Leave unchecked to share the page without your entered values.