Meeting cost clock
Watch the time cost add up across a room.
Playback is compressed; model values are shown separately.
Make a prediction
How much does halving the duration reduce this model cost?
Ready. Adjust the settings or press Run.
How it works & assumptions
Cost=people×hourly cost×minutes/60. The clock advances through the selected meeting duration; each person accrues the same rate.
USD input costs, not salary data. Time cost only; excludes preparation, overhead and the value produced by the meeting.
This is an ideal mathematical model, not a measurement or a forecast.