Examples
Examples
Try the starting example
- Projects: name, whole-cent cost $, stated benefit, required projects joined by | or none
- A,100,9,none B,100,8,none C,150,20,A
- Budget ($)
- 200
- Mutually exclusive project groups, joined by |; one group per line; or none
- none
- Mandatory project names joined by |, or none
- none
- Selection status
- optimal
- Selected project names
- A, B
- Total supplied benefit
- 17
- Total selected cost ($)
- $200.00
- Unspent budget ($)
- $0.00
Try another scenario
- Projects: name, whole-cent cost $, stated benefit, required projects joined by | or none
- A,100,9,none B,100,8,none C,150,20,A
- Budget ($)
- 250
- Mutually exclusive project groups, joined by |; one group per line; or none
- none
- Mandatory project names joined by |, or none
- none
- Selection status
- optimal
- Selected project names
- A, C
- Total supplied benefit
- 29
- Total selected cost ($)
- $250.00
- Unspent budget ($)
- $0.00
Calculation method
Calculation method
Selection status
Enumerate every subset of up to twenty projects, enforcing budget, logical inclusion dependencies, exclusions and mandatory choices.
Selected project names
Return the best-benefit feasible subset; break benefit ties by lowest cost, then enumeration order.
Total supplied benefit
Sum entered benefits without inventing a monetary interpretation.
Total selected cost ($)
Accumulate exact integer-cent costs for selected projects.
Unspent budget ($)
Budget−selected cost. No feasible portfolio gives an explicit infeasible status.
Symbols and units
- a
- Projects: name, whole-cent cost $, stated benefit, required projects joined by | or none
- b
- Budget ($)
- c
- Mutually exclusive project groups, joined by |; one group per line; or none
- d
- Mandatory project names joined by |, or none
Use the units shown. A list keeps the order in which you enter its values. The symbol ^ means “raised to the power of”.
Assumptions & limits
Assumptions & limits
- An exact small-subset solver under supplied additive costs and benefits, with at most twenty projects. Dependencies mean logical co-selection only, including jointly selected cycles; no execution schedule or uncertain benefit forecast is inferred.
Are these inputs private?
These calculations run in your browser. A shared link contains the values you choose to share. Only questions submitted to the separate AI finder are sent to OpenAI.